Basement Underpinning & Dig-Outs in Washington DC, Maryland & Virginia
Lower your basement floor, gain real ceiling height and turn a low, unusable basement into true living space.
More headroom, done safely

Many DC rowhouses and older homes have basements that are too low to finish comfortably or legally. Underpinning and dig-outs solve that by lowering the basement floor, giving you the ceiling height you need for a family room, a guest suite or a legal rental unit.
This is structural work on the foundation that holds up your home, and in rowhouses, often your neighbors' homes too. It has to be engineered, permitted and sequenced carefully. Ellery Contracting handles underpinning as a design-build team, so the structural work and the finished basement are planned together and built by one accountable company.
- In business
- More than a decade designing, building and remodeling homes.
- Where we work
- Washington DC, Maryland and Virginia.
- Licensed
- In DC, Maryland and Virginia, with permits pulled in our name.
- Our model
- Design-build: one team from first sketch to final walkthrough.



What makes a successful underpinning project
Underpinning is mostly invisible when it's done. These are the things that matter.
Engineering first
A structural engineer designs the underpinning or bench footings for your foundation and soil, and the plan is approved before any digging starts.
Careful sequencing
Underpinning is done in small, alternating sections so the foundation stays supported throughout. Rushing this step is never worth it.
Respect for neighbors
Shared and party walls need extra care. We document existing conditions and handle any required party wall agreements before work begins.
Planned with the finished space
Drainage, waterproofing, a new slab, plumbing and egress are designed together, so the deeper basement ends up dry, legal and comfortable.
Underpinning & dig-out services across DC, MD & VA
Every foundation is different. We scope each step in your written proposal.

01Assessment & engineering
Start with the foundation you have
Site evaluation, soil considerations and stamped structural drawings for the underpinning design.
We begin by learning how your house is built: what the foundation walls are made of, how deep they go and what they sit on. A structural engineer then designs the underpinning and stamps the drawings. No digging starts without that plan.
- 02
Permits & party wall agreements
Your neighbors are part of the plan
Building permits, inspections and coordination with neighbors when walls are shared.
Underpinning needs a building permit and inspections at set stages. In a rowhouse or semi-detached home, the wall you share with a neighbor is affected too, so notice and a written agreement are usually required. We help you work through that before construction begins.
- 03
Excavation & spoil removal
Careful digging in tight quarters
Digging out the basement floor and hauling away soil, often by hand or small equipment in tight rowhouse spaces.
In a rowhouse there is rarely room for large machines, so much of the soil is dug and carried out by hand or with compact equipment. We protect the rest of the house from dust, keep access clear for your neighbors and haul the soil away as the work advances.
04Underpinning or bench footings
Two ways to gain height
New footings poured beneath or beside the existing foundation in engineered, sequenced sections.
Full underpinning extends the foundation straight down and keeps the whole floor area. A bench footing leaves the old footing in place and builds a concrete ledge inside the wall, which costs less but gives up some floor space. Your engineer and the site conditions decide which one fits. Either way, the work is done in short, alternating sections so the house stays supported.
- 05
Drainage & waterproofing
A lower floor has to stay dry
Interior drainage, sump pumps and vapor control installed before the new slab.
A deeper basement sits closer to groundwater, so water management is built in before the slab is poured: perimeter drains, a sump pit and pump, and a vapor barrier under the concrete. It is far easier to do now than after the space is finished.
06New slab & plumbing
The floor you'll build on
A new concrete slab at the lower level, with underground plumbing for baths and laundry where needed.
Before the new slab goes down, we run the underground drain lines for any future bathroom, laundry or kitchenette. Then the gravel, vapor barrier and concrete are placed and finished level, ready for framing.
07Basement finishing
From dig-out to living space
Framing, insulation, egress, systems and finishes through our basement remodeling team.
Once the structure is complete, the basement is finished like any other: framing, insulation, wiring, plumbing, drywall and flooring. Because one team handles both stages, the layout, egress and plumbing locations are planned before the first section is dug.
What affects the cost of underpinning?
Underpinning is priced after an assessment and engineering review, because every foundation and site is different. These are the factors that move the number most.
Basement size
The length of foundation wall to underpin and the floor area to excavate.
Depth
How far the floor needs to drop to reach the ceiling height you want.
Underpinning or bench footing
Full underpinning beneath the walls generally costs more than a perimeter bench footing.
Soil and water
Soil type, the water table and how much drainage and waterproofing the new level needs.
Access and spoil removal
Tight rowhouse access often means hand excavation and conveyor removal of soil.
Shared walls and neighbors
Party wall agreements, pre-construction surveys and extra protection for adjacent homes.
Good to know when you budget
- Add a 10% to 20% contingency to any remodeling budget, and 20% to 25% for homes built before 1980.
- Many DC neighborhoods, including Capitol Hill, Georgetown, Dupont Circle and Logan Circle, require Historic Preservation review, which can add 6 to 12 weeks.
Tell us about your underpinnings & dig-outs project and we’ll prepare a detailed written proposal, with no pressure to sign.
How your underpinning project comes together
Underpinning is structural work under a standing house, so it follows the engineer's sequence exactly. Each stage is inspected before the next begins.
See our full design-build process- Step 01
Consultation & assessment
We look at your basement, its height, foundation and water conditions, and talk through your goals.
- Step 02
Engineering & design
A structural engineer designs the underpinning, and we plan the finished basement around it.
- Step 03
Permits & neighbors
We pull permits and handle party wall agreements and pre-construction documentation.
- Step 04
Excavation & underpinning
We dig out and underpin in engineered sections, with inspections at each required stage.
- Step 05
Slab, drainage & finish
We install drainage and a new slab, then finish the basement or hand it over ready for finishing.
What homeowners say about working with Ellery

Underpinnings & Dig-Outs questions, answered.
01 — What is basement underpinning?
Underpinning strengthens and deepens an existing foundation by building new footings beneath it. It's most often used to lower a basement floor and gain ceiling height, so a low basement can become finished living space.
02 — What's the difference between underpinning and a bench footing?
Underpinning extends the foundation straight down beneath the existing walls. A bench footing leaves the existing footing in place and adds a concrete ledge, or bench, around the perimeter at the new lower level. Bench footings can cost less but take up a little floor space. Your engineer will recommend the right approach.
03 — How much does it cost to underpin a basement in DC?
Cost depends on the size of the basement, how deep we need to go, soil and water conditions, access for excavation and whether walls are shared with neighbors. We provide a detailed estimate after an assessment and engineering review.
04 — How much ceiling height can I gain?
Most dig-outs aim for a comfortable finished ceiling height that meets code for living space. How far we can go depends on your foundation, soil, the sewer line and drainage, which the engineer evaluates up front.
05 — Is underpinning safe for my house and my neighbors?
Yes, when it's engineered, permitted and done in carefully sequenced sections. We document the condition of neighboring walls before starting and follow the engineer's plan and inspection schedule throughout.
06 — Do I need a permit for a basement dig-out?
Yes. Underpinning is structural work that requires permits, stamped engineering drawings and inspections in DC, Maryland and Virginia. Rowhouse projects may also require a party wall agreement.
07 — Can I live in my home during underpinning?
Often, yes, since the work is in the basement, though there will be noise, dust control measures and some days with limited access. We'll talk through what to expect for your home before work starts.
08 — How long does underpinning take?
Engineering and permits come first. The excavation and underpinning itself is done in sections and typically takes several weeks, followed by drainage, the new slab and finishing. We give you a written schedule before work begins.
Let’s bring your vision to life.
Tell us about your project. We’ll meet to talk through your goals, then prepare a detailed proposal with a clear scope, budget and timeline.