- Home
- Resources
Remodel with confidence.
Practical advice from Ellery's Homeowners' Remodeling Guide: how to choose the right contractor, what to ask, what things cost in the DC area and what to expect along the way.
Nine things to get right before you hire
Choosing your contractor is the most important decision you'll make in a remodel. Here's what to look for.
- 01
What to prioritize
Proof of an established business, the right license for where you live, a current certificate of insurance, consistent reviews and a transparent written contract.
- 02
Company standards
Daily jobsite cleanup, clear expectations for professional conduct in your home, and trusted, vetted crews. Ask who will be on site and how they're vetted.
- 03
Professionalism
A detailed written proposal, drawings that match the scope, permits pulled before work begins and a no-pressure sales process. Feeling rushed is a red flag.
- 04
Design feasibility
Design-build keeps design and construction in one team, with earlier cost analysis, realistic timelines and one company accountable from start to finish.
- 05
Reputation
Prioritize Google reviews, word of mouth and testimonials. Look for a steady history, reviews that name people and projects, and how problems were handled.
- 06
Licensed contractors
Home improvement contractors must be licensed where the work happens. Licensing means qualifications, code knowledge and accountability to a regulator.
- 07
Communication
You should have a dedicated point of contact and regular updates on progress, schedule and any challenges, with clear answers and no surprises.
- 08
Workmanship
Ask to see completed projects like yours, and get the workmanship warranty in writing: what it covers and for how long.
- 09
Financing & payments
Know your budget before design, tie payments to completed milestones, plan a contingency and put every change in a signed change order.
Questions to ask
- Who is my main point of contact?
- How often will I get updates, and how?
- How are changes and surprises handled?
- Who will be working in my home, and how are they vetted?
- Can I see completed projects similar to mine?
- Will you pull the permits, and which inspections are required?
- What does your workmanship warranty cover, and for how long?
- How is the payment schedule tied to completed work?
Red flags
- No business address or website
- No written contract or detailed proposal
- Requests for a large cash deposit
- A price far below every other bid
- Reluctance to pull permits
- High-pressure tactics to sign quickly
- Can't show a license number or insurance certificate
The contractor checklist
Tick off what each company you're considering can show you. Every item should be backed by proof.
| What to look for | Ellery | Company A | Company B |
|---|---|---|---|
| Established business, 10+ years | ✓ | ||
| Licensed for your jurisdiction (DC · MD · VA) | ✓ | ||
| Proof of insurance | ✓ | ||
| Strong, consistent Google reviews | ✓ | ||
| Design-build: design and construction in one team | ✓ | ||
| Detailed written proposal | ✓ | ||
| Permits pulled for all required work | ✓ | ||
| No-pressure sales experience | ✓ | ||
| Dedicated point of contact | ✓ | ||
| Daily jobsite cleanup | ✓ | ||
| Portfolio of completed projects | ✓ | ||
| Written workmanship warranty | ✓ |
What remodeling costs in the DC area
Typical ranges for the Washington DC metro area. Your price depends on size, condition and finishes.
| Project | Basic | Mid-range | High-end & luxury |
|---|---|---|---|
| Kitchen Remodeling | $25,000 – $45,000Refresh the existing layout | $50,000 – $90,000A full overhaul | $100,000 – $250,000Full design-build |
| Bathroom Remodeling | $10,000 – $20,000Cosmetic update | $22,000 – $45,000Full gut renovation | $50,000 – $120,000Spa-level primary bath |
| Basement Remodeling | $20,000 – $40,000Basic finish | $45,000 – $80,000Multi-room finish | $90,000 – $175,000Full suite, ADU-ready |
| Whole-Home Renovations | $100 – $150 / sq ftSelective, phased updates | $175 – $275 / sq ftFull gut renovation | $300 – $500+ / sq ftLuxury renovation and addition |
| Home Additions | $150 – $225 / sq ftSmall bump-out or sunroom | $250 – $375 / sq ftFull room or story addition | $400 – $600+ / sq ftMajor or second-story addition |
- Add a 10% to 20% contingency to any remodeling budget, and 20% to 25% for homes built before 1980.
- Permit fees are based on project value. A $100,000 kitchen remodel can carry $1,500 or more in permit fees.
- Many DC neighborhoods, including Capitol Hill, Georgetown, Dupont Circle and Logan Circle, require Historic Preservation review, which can add 6 to 12 weeks.
Check a license where you live
Contractors must be licensed by the District or state where the work happens. Verify the license matches your address, and check whether the company has recently changed its name.
Department of Licensing and Consumer Protection (DLCP)
Permits: DC Department of Buildings (DOB).
Maryland Home Improvement Commission (MHIC)
Permits: Montgomery or Prince George's County, or the City of Rockville inside city limits.
Department of Professional and Occupational Regulation (DPOR)
Permits: Arlington County, Fairfax County or the City of Alexandria.
Eight steps from idea to move-in
- 01
Define your scope
Outline your goals, desired outcomes and budget, so you can communicate clearly and get accurate estimates.
- 02
Initial consultation
Share your ideas and review the firm's portfolio and reviews to make sure you're aligned.
- 03
Budget planning
Set a realistic budget and a contingency for unforeseen conditions, especially in older homes.
- 04
Site visit & measurements
The team assesses the space, takes measurements and discusses your vision before developing concepts.
- 05
Design development
Concepts become detailed plans, with layouts, materials and finishes finalized to prevent costly changes later.
- 06
Permits & pre-construction
Permits are obtained, trade partners scheduled and materials ordered, confirmed at a pre-construction meeting.
- 07
Construction
Work begins, with regular updates from your point of contact on progress and decisions that need your input.
- 08
Project completion
A final walkthrough reviews every detail, finishes touch-ups and hands over a clean space ready to enjoy.
A remodeling glossary
- Design-build firm
- A company that manages both the design and construction phases of a project for a seamless process.
- General contractor (GC)
- A licensed professional who manages a construction project, coordinating trade partners, materials and permits.
- Scope of work
- A detailed document outlining all the tasks, materials and timelines involved in a project.
- Change order
- A signed document detailing changes to the original scope, timeline or cost.
- Certificate of insurance
- Proof that a contractor carries liability and workers' compensation coverage.
- Permit
- Official approval required for certain types of construction work.
- Building code
- Regulations set by local authorities that specify safety and structural standards.
- Certificate of occupancy
- A document from local authorities certifying a building complies with codes and is safe to occupy.
- Trade partner
- A specialist hired by the contractor for specific tasks, such as plumbing or electrical work.
- Punch list
- A list of final tasks or touch-ups to complete before the project is closed out.
- Final walkthrough
- An inspection of the completed project with your contractor to confirm it meets expectations.
- Workmanship warranty
- The contractor's written promise covering the quality of its work for a set period after completion.
- Underpinning
- Strengthening and deepening an existing foundation, often to lower a basement floor and gain ceiling height.
- Dig-out
- Excavating below an existing basement or crawl space to create new, usable living area.
Let’s bring your vision to life.
Tell us about your project. We’ll meet to talk through your goals, then prepare a detailed proposal with a clear scope, budget and timeline.





